H144 · F13

H144

Shaping preflight. A bounded, low-cost preflight audit may verify material risks before longer Shaping work. Compare audit cost, detected risks, false blocks, and Build outcomes against a matched no-preflight control.

Evidence status · NO EMPIRICAL EVIDENCE

NO EMPIRICAL EVIDENCE; no controlled comparison is identified.

This is the status recorded in the hypothesis register. It does not establish that the proposition is true or false.

Falsifiable proposition

Exact wording from the hypothesis register.

Shaping preflight. A bounded, low-cost preflight audit may verify material risks before longer Shaping work. Compare audit cost, detected risks, false blocks, and Build outcomes against a matched no-preflight control.

F13 · Late-September product mechanisms

The source register does not provide a separate falsification rule or next-test field for this entry.

Claim ledger links

Each linked claim retains its original status and evidence label.

No claim-ledger row links this hypothesis.