F13

Late-September product mechanisms

The source summary is shown as authored. Follow its evidence links for study-specific status and cohort limits.

Source-reported narrativeValues in this source section that are not tied to a claim-ledger record remain source-reported and are not promoted to verified results.

Findings source section · FINDINGS.md

Hypothesis: H140–H147 concern cross-harness review, audits, reuse, reliability, parallel Builds, and status alerts. The family page records no controlled efficacy result for these product mechanisms.

What ran: Related records include recovery diagnostics, a planned-DAG topology pilot, and surface-feedback observations. They do not instantiate the proposed audits, second-host workflow, or alert-on/control comparisons.

Result: Numerator/denominator: not recorded for a controlled outcome cohort. Unit: reliability, throughput, defect detection, or operator detection time, depending on the proposition. Date: not recorded. Status: no empirical efficacy evidence; adjacent diagnostics remain separate.

What it does not show: A topology pilot does not establish second-host throughput, Build ownership, or verification safety; implementation or use alone is not a measured benefit.

Evidence: F13 hypothesis page, recovery diagnostics, parallel topology pilot, surface feedback record, Jev route context, Jev triage context. Spec map: landing and recovery, process custody, and deferred scope.