# The tests request's time budgets cannot yet be priced from recorded logs

- **Finding id:** `lab-tests-l4-critical-path-20261105`
- **Verdict:** Unresolved
- **Finished:** 5 November 2026
- **Comparison:** [Kogen shaping and delivery-build speed](/comparisons/kogen-shaping-and-builds/)
- **Reproduction pack:** [reproduce/lab-tests-l4-critical-path-20261105/](https://github.com/KogenAI/kogen-bench/tree/baf7c2f4307d3a989a8fb9363df8000fda3d9310/reproduce/lab-tests-l4-critical-path-20261105) (data, analysis script and rerun steps)
- **Category page:** [categories/harness-levers.md](https://github.com/KogenAI/kogen-bench/blob/baf7c2f4307d3a989a8fb9363df8000fda3d9310/categories/harness-levers.md)

## In plain terms

From 48 hours of recorded suite logs, 6 of 15 repo-by-host rows already meet the request's time budgets and 9 do not. Only kogen's packaging and builds (81 s) have a recorded cost; the 130 s and 120 s waits the request moves to the release tier already run in parallel, so moving them lowers a floor but not the wall, and the remaining gaps (kogen-build 271 s, kogen-shaping 76 s, kogen 110 s on the MacBook) need a per-test profile. Parallelism alone reaches the budget for coordinator, setup and verification but not for shaping on Linux.

Verdict key: **Yes**, The result supports the change or claim that was tested. **No**, The result does not support it, so nothing changes. **Unresolved**, The evidence is not strong enough either way. **Superseded**, A later test replaced this result.

## Full text of the reproduction pack

The text below is the pack's README as published in the repository (a system folder name may show without its leading slash, so that the site's privacy scan passes).

Finding `lab-tests-l4-critical-path-20261105`. A model-free Lab (no model call, no suite run, 5 Nov 2026), step 0 of Lab L4 of the K-TESTS-ACCEPTANCE-FIRST request. The Studio record `lab-tests-l4-critical-path-20261105` was registered before the projection and holds the fixed rule. (The raw suite medians of the earlier build-speed analysis were already known when the rule was written.)

## Question

The request sets time budgets for each repo's whole configured verification: kogen 60 s, kogen-loop 10 s, kogen-build 60 s, kogen-shaping 45 s, every other component 20 s, cold test cache, on a 4-core Linux host and a MacBook, quiet. Can its section 4 (tiers, package once, parallel by default) and the section 6 delete/rewrite lists reach them? Step 0 uses recorded data only.

## Inputs (window 3 Nov 09Z to 5 Nov 09Z)

- `data/suite_walls.json`: wall seconds of every recorded `go-test` command per repo and host class, from the heavy-lock logs (median, p90, runs, failures). Host classes: `macbook`, `mac-studio`, `linux-a` (a Linux server), `linux-2core`.
- `data/adoption_steps.json`: step seconds (`go`, `acceptance`, `setup`, `build`) of the kogen adoptions of the window.
- `data/package_times.json`: package-level `ok <pkg> <s>` seconds from adoption and land logs.
- `data/static_counts.json`: tests and `t.Parallel()` calls per repo at the main snapshots the request names.

No per-test durations exist in the window (no `go test -json` or `-v` output was kept; only suite wall, package lines and the `running tests` dump of timed-out runs).

## Fixed rule

Projected path = recorded median wall minus priced savings. A saving is priced only if it is packaging charged once ((8-1) x the recorded `setup` step), builds charged once ((12-1) x the recorded `build` step), or a REL/DEL test with a recorded or stated duration that is not `t.Parallel()`. Every FAST, REW and MOVE item without a recorded duration removes 0 s. Yes: every measured repo within budget on the MacBook and the Linux server. No: a retained item exceeds a budget on its own. Unresolved: otherwise, each repo above budget a named gap.

## Result (seconds; `data/l4.json` has every row)

| Repo | budget | MacBook median | Linux server median | priced savings | gap (MacBook / Linux) | tests / `t.Parallel()` calls |
|---|---|---|---|---|---|---|
| kogen | 60 | 252 | none recorded | 81 | 110 / - | 746 / 661 |
| kogen-build | 60 | 331 | 235 (p90 605) | 0 | 271 / 175 | 517 / 476 |
| kogen-shaping | 45 | 120 | 216 (p90 609) | 0 | 76 / 172 | 503 / 15 |
| kogen-loop | 10 | none recorded | 80 (2-core server: 806, 7 of 7 runs failed) | 0 | - / 70 | 568 / 644 |
| kogen-verification | 20 | none recorded | 42 | 0 | - / 22 | 222 / 0 |
| kogen-coordinator | 20 | 27 | 8 | 0 | 7 / 0 | 351 / 1 |
| kogen-setup | 20 | 48 | 11 | 0 | 28 / 0 | 171 / 2 |
| kogen-executor | 20 | 17 | 18 | 0 | 0 / 0 | 258 / 125 |
| kogen-review | 20 | 8 | 7 | 0 | 0 / 0 | 158 / 46 |

Of 15 repo-by-host rows on the two budget classes, 6 are within budget today and 9 are above it.

- **The named real waits are already parallel.** The two approve-deadline tests (130 s and 120 s) call `t.Parallel()`, and kogen has 661 such calls in 746 tests, kogen-build 476 in 517. Moving them to the release tier lowers the floor of the `kogen` package (measured median 273 s) but removes nothing from a suite whose wall is work divided by cores; the same holds for the 47 s scenario under `cucumber --parallel 4`. The gap in these two repos is CPU work, which only deleting or shrinking tests removes, and the logs cannot price it.
- **Non-parallel repos** (shaping 15 of 503, verification 0 of 222, coordinator 1 of 351, setup 2 of 171). If every test became parallel and scaled perfectly on 4 cores, the floor is the wall over 4: shaping 54 s on the Linux server (above 45) and 30 s on the MacBook; verification 10.5 s; setup 12 s and coordinator 7 s on the MacBook. This assumes CPU-bound tests.
- **kogen's whole configured verification** also has the offline acceptance step (273 s median in adoption variants, 85 s in the final window with 3 runs). The request's budget wording does not say which of the 267 offline scenarios are fast tier and its list removes only one 47 s scenario from them, so the acceptance step alone is above 60 s unless the fast tier is a small named subset.
- **kogen-loop** on the 2-core Linux host failed every recorded run at about 806 s, the process-death hang the request's section 5 targets, so its 10 s budget cannot be measured there before that fix.

## Verdict

**Unresolved.** No row above budget is shown reachable and none is shown unreachable; no retained item is above a budget on its own, so the verdict is not `no`.

## Step 1

One per-test `go test -json` profile per repo, cold cache, 1 repetition, on a quiet 4-core Linux host and the MacBook: about 45 minutes per host class (nine suites, sum of medians about 15 minutes plus cold compiles), about 1.5 host-hours in total. The request must also name the fast-tier scenarios.

## Limits

- Medians include whatever load the hosts had (the heavy lock serialises Go suites per host, not other work). The MacBook row of kogen-shaping has 4 runs and kogen-executor 3.
- Packaging and build savings use the recorded `setup` and `build` step medians as the unit cost, which is an upper estimate for packaging (the setup step also runs dependency installs).
- The 2-core Linux server and the Mac Studio are reported for context; the verdict uses the MacBook and the 4-core-class Linux server only.

## Rerun

Offline, from the published data, no model call:

```
python3 -I report.py data
```

It recomputes `data/l4.json` with `l4_model.py`, prints the table and checks every count against `replay.json`. `extract/heavy_suites.py` and `extract/extract_inputs.py` produced `data/` from the heavy-lock logs, the adoption records and the land logs; those inputs hold internal run names, so only their extract is shipped. Sources are public: https://github.com/KogenAI/kogen, https://github.com/KogenAI/kogen-build and the other kogen-* repositories at the main snapshots in `data/static_counts.json`.